op deze pagina direct naar:
  • inhoud
  • subinhoud (linkerkolom)
  • subinhoud (rechterkolom)
  • search

Gas Transport Services

  • Sitemap
  • Disclaimer
  • Nederlands
Search the website
  • About GTS
  • Shippers
  • Connected Parties
  • Suppliers
  • Transportinformation
  • Markettransition
  • Downloads

Home Shippers Terms & Conditions TSC 2010-1

TSC 2010-1

  • stuur door

Transmission Service Conditions 2010-1 en appendices

TSC 2010-1

Appendix 1a (entries)

Appendix 1b (exits)

Appendix 1c (tariffs)

Appendix 2a Quality and pressure entry points

Appendix 2b Quality and pressure exit points

Appendix 3 Diversion

Appendix 4 Wheeling

Appendix 5 Operating procedures

Appendix 6 Allocation procedures

Appendix 7 Balancing service

Appendix 8 Exit points t=t

Appendix 9 Capacity tranches

Appendix 10 Flexibility services

 

On December 23 we have sent a letter to our Shipper with information about the change in Article 2.12.2 of the TSC 2010.

  • Terug naar boven
  • News
  • Terms & Conditions
    • Gas conditions
    • TSC 2010-1
    • TSC 2009-2
    • TSC 2009-1
    • TSC 2008-1
    • TSC 2007-1
    • TSC 2006-1
  • Licensing
  • Our Services
  • Balancing
  • Tariffs
  • Operational handling
  • Online Services
  • Integrated Open Season
  • Shipper meeting presentations
  • Application forms
  • Contact

© Gas Transport Services 2010